Successful Case

Successful Case

Case 1

Sludge reduction operation service for a municipal sewage plant in Guangzhou (100,000m3/d,partial sludge)

Case 1

Sludge reduction operation service for a municipal sewage plant in Guangzhou (100,000m3/d,partial sludge)
  • Sludge treatment capacity: 30 t/d (at 80% moisture content)
  • Moisture content of raw mud ≥ 99%
  • Sludge moisture content ≤ 40%
  • Reduced sludge volume: 10 t/d

Case 2

Emergency service project for sludge reduction in a municipal sewage plant in Dongguan (30,000m3/d)

Case 2

Emergency service project for sludge reduction in a municipal sewage plant in Dongguan (30,000m3/d)
  • Daily sewage treatment capacity: 30000 t/d
  • Sludge treatment capacity: 15 t/d (at 80% moisture content)
  • Moisture content of raw mud ≥ 99%
  • Sludge moisture content ≤ 40%
  • Reduced sludge volume: 5 t/d

Case 3

TITLESludge reduction project of a municipal sewage treatment plant in Dongguan (200,000m3/d)

Case 3

TITLESludge reduction project of a municipal sewage treatment plant in Dongguan (200,000m3/d)
  • Daily sewage treatment capacity: 200000 t/d
  • Sludge treatment capacity: 150 t/d (at 80% moisture content)
  • Moisture content of raw mud ≥ 99%
  • Sludge moisture content ≤ 50%
  • Reduced sludge volume: 60 t/d

Case 4

Coal Mine Sewage Treatment Plant under Shaanxi Energy Group

Case 4

Coal Mine Sewage Treatment Plant under Shaanxi Energy Group
  • Daily sewage treatment capacity: 2000t/d
  • Sludge treatment capacity: (coal slurry) 400t/d (at 80% moisture content)
  • Dehydration process before renovation: belt filter press, moisture content of sludge after dehydration: 80%
  • After applying our company's process transformation, the moisture content of sludge after dehydration is 18-20%

Case 5

A Grain, Oil and Food Co., Ltd

Case 5

A Grain, Oil and Food Co., Ltd
  • Sludge treatment capacity: 5.2 t/d (at 80% moisture content)

  • Moisture content of raw mud: ≥ 99%

  • Moisture content of mud discharge: < 30%