| Successful CaseCase 1Sludge reduction operation service for a municipal sewage plant in Guangzhou (100,000m3/d,partial sludge)
Case 1
Sludge reduction operation service for a municipal sewage plant in Guangzhou (100,000m3/d,partial sludge)
|
- Sludge treatment capacity: 30 t/d (at 80% moisture content)
- Moisture content of raw mud ≥ 99%
- Sludge moisture content ≤ 40%
- Reduced sludge volume: 10 t/d
|
Case 2Emergency service project for sludge reduction in a municipal sewage plant in Dongguan (30,000m3/d)
Case 2
Emergency service project for sludge reduction in a municipal sewage plant in Dongguan (30,000m3/d)
|
- Daily sewage treatment capacity: 30000 t/d
- Sludge treatment capacity: 15 t/d (at 80% moisture content)
- Moisture content of raw mud ≥ 99%
- Sludge moisture content ≤ 40%
- Reduced sludge volume: 5 t/d
|
Case 3TITLESludge reduction project of a municipal sewage treatment plant in Dongguan (200,000m3/d)
Case 3
TITLESludge reduction project of a municipal sewage treatment plant in Dongguan (200,000m3/d)
|
- Daily sewage treatment capacity: 200000 t/d
- Sludge treatment capacity: 150 t/d (at 80% moisture content)
- Moisture content of raw mud ≥ 99%
- Sludge moisture content ≤ 50%
- Reduced sludge volume: 60 t/d
|
Case 4Coal Mine Sewage Treatment Plant under Shaanxi Energy Group
Case 4
Coal Mine Sewage Treatment Plant under Shaanxi Energy Group
|
- Daily sewage treatment capacity: 2000t/d
- Sludge treatment capacity: (coal slurry) 400t/d (at 80% moisture content)
- Dehydration process before renovation: belt filter press, moisture content of sludge after dehydration: 80%
- After applying our company's process transformation, the moisture content of sludge after dehydration is 18-20%
|
Case 5A Grain, Oil and Food Co., Ltd
Case 5
A Grain, Oil and Food Co., Ltd
|
- Sludge treatment capacity: 5.2 t/d (at 80% moisture content)
- Moisture content of raw mud: ≥ 99%
- Moisture content of mud discharge: < 30%
|
|